- Postcode area
- CB
- County
- Cambridgeshire
- Region
- East of England
- Population (approx.)
- 21,000
- From our Birmingham office
- 93 miles
- Typical lead time
- 3–5 weeks
How do Ely buildings affect the install?
Smaller Ely offices often need just a few metres of partitioning — a manager's room, a meeting space or a quiet booth — and we are happy to take on compact jobs as well as larger ones.
For Ely businesses that share a building, we keep noise, dust and deliveries to agreed windows so neighbours are not disturbed.
What do demountable partitions cost in Ely?
The mix of solid, glazed and door modules, panel finish, and whether integral blinds or acoustic infills are specified account for most of the difference in price. Typical lead time: 3–5 weeks. Guide prices, supply and install — fixed after a free survey.
Why do Ely businesses choose us?
Work around your hours
Evening and weekend installation can be arranged for occupied Ely offices, keeping disruption to a minimum.
No wet trades
Factory-finished panels arrive ready to use, so there is no plastering, drying or painting, and offices can be occupied soon after installation finishes.
Free survey in Ely
We measure the space, check ceilings, floors and services, and talk through how you want the office to work before anything is priced.
Services built in
Integral channels carry power and data cabling, so sockets and switches can be moved with the walls and adding outlets later is straightforward.
Typical demountable partitions projects we see in Ely include cellular office floors, public sector and education buildings and short and medium leases. Standard modules give a uniform appearance across the floor, with matching doors, glazing and skirting, which suits larger multi-office layouts.
What specification is typical?
| Solid panels | Laminate, vinyl, painted steel or fabric-faced, often with mineral wool infill |
|---|---|
| Glazed modules | Single or double glazed, toughened or laminated, optional integral blinds |
| Height | Usually up to approx. 3m, with adjustable head to absorb ceiling variation |
How do surveys work in Ely?
If you are in Ely or close by in Newmarket or Wisbech, book a free survey and we will come and measure. You will receive drawings and a fixed price before you commit to anything.
In England, partition works that affect fire safety or means of escape fall under the Building Regulations, so we flag anything that may need Building Control at survey stage.
From survey to handover
Free survey
We visit your Ely premises, measure up, check ceilings, floors and services and talk through how the space needs to work.
Design and fixed price
You receive a layout, specification and a fixed, itemised quote. Nothing is ordered until you are happy with the drawings.
Manufacture and planning
Glass and components are made to the surveyed sizes while we plan access, deliveries and any out-of-hours working.
Install and sign-off
We fit the partitions with minimal disruption, complete snagging and walk you through the finished space.
Ely demountable partitions FAQs
How soon can you start on a Ely project?
Typical lead time for demountable partitions is 3–5 weeks from signed-off drawings, mostly because materials are made to measure. Installation itself is usually a matter of days for a typical office, and we can phase work around a Ely office that stays open.
Will our Ely landlord need to approve the partitions?
If you lease your Ely office, the lease will usually require landlord consent — often a licence for alterations — before partitions are installed. We supply drawings, specifications and method statements to support the application.
How much do demountable partitions cost?
Demountable partitions typically cost £180–£320 per m² supplied and installed, excluding VAT. All-solid walls sit at the lower end, while a higher proportion of glazed modules, integral blinds and acoustic infills push the price up. We confirm a fixed price after a free site survey and once the layout is fixed.
How quickly can demountable partitions be installed?
Quickly. Panels arrive finished, so a run of four to six offices usually takes three to five days on site, with no drying or decorating time. Lead time for manufacture is typically three to five weeks from layout approval, and the floor can be phased so teams keep working.
Speak to us about demountable partitions for your Ely premises — free survey, clear drawings and a fixed price before work starts.
