Free site survey & fixed written quotesGlass, solid & demountable partitionsUK-wide installation teams
0800 088 6248
West Midlands · B postcodes

Fire Rated Glass Partitions for Oldbury offices

If your Oldbury office needs better use of space, more privacy or quieter meeting rooms, fire rated glass partitions are often the quickest route. We cover Oldbury, West Midlands and the surrounding West Midlands area with survey-led, fixed-price installations.

Guide £850–£1,400 per m² + VATLead time 4–6 weeksFree survey

Free survey in Oldbury

Tell us about the space — we'll call to book a measured survey.

Postcode area
B
County
West Midlands
Region
West Midlands
From our Birmingham office
5 miles
Typical lead time
4–6 weeks

What should Oldbury offices plan for?

Rural and edge-of-town premises near Oldbury can have awkward access, so we plan panel sizes and delivery times on the survey to avoid surprises on the day.

For Oldbury businesses that share a building, we keep noise, dust and deliveries to agreed windows so neighbours are not disturbed.

How much do fire rated glass partitions cost in Oldbury?

£850–£1,400 per m² + VAT

Insulated EI glass costs considerably more than integrity-only E glass, and the duration, frame system and fire-rated door sets account for most of the remaining range. Typical lead time: 4–6 weeks. Guide prices, supply and install — fixed after a free survey.

Price my project

What do you get with us in Oldbury?

Compliance designed in

We check the required duration and E or EI class against your fire strategy before ordering, so the wall is right first time rather than reworked.

Clear guide prices online

Our fire rated glass partitions prices are published as guide ranges, so you can budget before the survey.

Light through fire lines

Corridors, stair lobbies and compartment walls can stay bright and open while still meeting the fire strategy, instead of becoming dark solid-walled routes.

Work around your hours

Evening and weekend installation can be arranged for occupied Oldbury offices, keeping disruption to a minimum.

Typical fire rated glass partitions projects we see in Oldbury include escape corridors, server and plant room fronts and compartment walls between tenancies. We provide the manufacturer's test evidence and classification for the installed system, so Building Control, insurers and landlords can verify what is in the wall.

Specification highlights

FramesTested steel or aluminium framing with intumescent seals and specified fixings
DoorsMatching fire-rated glazed door sets with tested hinges, closers, locks and smoke seals
RegulationsApproved Document B; Approved Document K for safety glazing and manifestation

Covering Oldbury and nearby

Survey visits across West Midlands — including Oldbury, West Bromwich and Smethwick — are free and carry no obligation. We measure, photograph and note services so the quote is accurate first time.

In England, partition works that affect fire safety or means of escape fall under the Building Regulations, so we flag anything that may need Building Control at survey stage.

From survey to handover

  1. Book a survey

    A member of the team measures the Oldbury office, notes access and services, and discusses layout, privacy and acoustics with you.

  2. Specification sign-off

    Drawings, system choice, glass and door details are confirmed in writing alongside a fixed quote.

  3. Production and logistics

    Made-to-measure panels are produced and we book deliveries, lifts and parking around your building.

  4. Installation and handover

    The team installs, snags and cleans, then hands over the site with any test evidence and care guidance.

Fire Rated Glass Partitions in Oldbury: FAQs

How soon can you start on a Oldbury project?

Typical lead time for fire rated glass partitions is 4–6 weeks from signed-off drawings, mostly because materials are made to measure. Installation itself is usually a matter of days for a typical office, and we can phase work around a Oldbury office that stays open.

Do you cover areas near Oldbury?

Yes. As well as Oldbury we regularly cover West Bromwich, Smethwick and Dudley, plus the rest of West Midlands and West Midlands. Survey and installation teams are arranged regionally.

Is the glass alone enough to make a partition fire rated?

No. Fire performance applies only to the complete tested system, meaning the glass, frame, seals, fixings and door hardware installed as tested. Fitting fire-rated glass into a standard frame does not create a fire-rated wall. We supply complete tested systems and hand over the manufacturer's test evidence and classification.

How long does a fire rated glass partition last in a fire?

Most office systems are classified for 30 or 60 minutes, written as E 30, EI 30, E 60 or EI 60. The figure is the time the tested system kept its integrity, and insulation where stated, in a standard furnace test to BS EN 1364-1. The duration you need is set by the building's fire strategy.

Whether your Oldbury project is a single room or a whole floor, we will survey, design and install your fire rated glass partitions with one team.

Fire Rated Glass Partitions in Oldbury

Free survey, fixed written price and installation around your working hours.

Call Get a quote