- Postcode area
- SY
- County
- Shropshire
- Region
- West Midlands
- Population (approx.)
- 77,000
- From our Birmingham office
- 36 miles
- Typical lead time
- 1–3 weeks
Planning fire rated partition walls in Shrewsbury: local points
Many Shrewsbury workplaces are owner-occupied, which makes it easier to choose systems for the long term — acoustic glass for meeting rooms, for example, rather than the cheapest option.
For Shrewsbury buildings with older timber floors or plastered ceilings, we check fixings and deflection on survey so the partitions stay true once the building moves with the seasons.
How much do fire rated partition walls cost in Shrewsbury?
The required duration (30, 60 or 90 minutes), number of fire board layers, wall height and the extent of fire stopping around services and at the head set the price. Typical lead time: 1–3 weeks. Guide prices, supply and install — fixed after a free survey.
Why use us for fire rated partition walls in Shrewsbury?
Acoustic bonus
Multi-layer fire walls are also good acoustic walls, so plant rooms and stair enclosures keep noise away from the surrounding office.
Handover records
You receive the system classification, fire-stopping record and photographs, giving your fire risk assessor and Building Control clear evidence of what was built.
Free survey in Shrewsbury
We measure the space, check ceilings, floors and services, and talk through how you want the office to work before anything is priced.
Work around your hours
Evening and weekend installation can be arranged for occupied Shrewsbury offices, keeping disruption to a minimum.
Typical fire rated partition walls projects we see in Shrewsbury include protected escape corridors, server, comms and plant rooms and tenancy separation walls. Services crossing the wall are coordinated in advance and sealed with tested products, which is where most fire walls actually fail in inspections.
Specification highlights
| Test standard | Non-loadbearing walls tested to BS EN 1364-1 (older data to BS 476-22) |
|---|---|
| Framing | Steel studs 50–146mm at the system's specified centres |
| Head detail | Tested fire-rated deflection head to accommodate slab movement |
Covering Shrewsbury and nearby
If you are in Shrewsbury or close by in Telford or Welshpool, book a free survey and we will come and measure. You will receive drawings and a fixed price before you commit to anything.
In England, partition works that affect fire safety or means of escape fall under the Building Regulations, so we flag anything that may need Building Control at survey stage.
From survey to handover
Measure and assess
We take accurate measurements on site in Shrewsbury, check the ceiling void and floor, and agree what the new layout must achieve.
Drawings and quote
We prepare drawings and an itemised fixed price, adjusting the design until it works for your team and budget.
Order and schedule
Materials are ordered to exact sizes and we agree installation dates, working hours and site rules with you.
Installation and handover
The team installs, snags and cleans, then hands over the site with any test evidence and care guidance.
Fire Rated Partition Walls in Shrewsbury: FAQs
How soon can you start on a Shrewsbury project?
Typical lead time for fire rated partition walls is 1–3 weeks from signed-off drawings, mostly because materials are made to measure. Installation itself is usually a matter of days for a typical office, and we can phase work around a Shrewsbury office that stays open.
Can you work out of hours at our Shrewsbury office?
Yes. Evening and weekend installation can be arranged in Shrewsbury so the office keeps running. Out-of-hours working usually adds a percentage to the labour cost, which is shown clearly on the quote.
How much does a fire rated partition wall cost?
Fire rated partition walls typically cost £75–£125 per m² supplied and installed, excluding VAT. A 30-minute wall with one layer of fire board each side sits at the lower end; 60 or 90-minute walls with multiple layers and extensive fire stopping sit at the top. Fire doors are priced separately. We confirm a fixed price after a free survey.
How long does a fire rated stud wall last in a fire?
Office fire walls are commonly classified for 30, 60 or 90 minutes, such as EI 30 or EI 60. That figure is the time the tested wall maintained integrity and insulation in a standard furnace test. The duration you need is set by the building's fire strategy and Approved Document B.
Whether your Shrewsbury project is a single room or a whole floor, we will survey, design and install your fire rated partition walls with one team.
