Fire Rated Partition Walls for Smethwick offices

Smethwick offices come in every shape — modern floorplates, converted older buildings and business-park units. We tailor fire rated partition walls to the building you actually have, not a brochure layout.

Guide £75–£125 per m² + VATLead time 1–3 weeksFree survey

Free survey in Smethwick

Tell us about the space — we'll call to book a measured survey.

Postcode area
B
County
West Midlands
Region
West Midlands
Population (approx.)
54,000
From our Birmingham office
5 miles
Typical lead time
1–3 weeks

What is different about partitioning in Smethwick?

In Smethwick, installations are often completed in a few days, and we can usually start on site soon after drawings are signed off because the survey answers the practical questions early.

For Smethwick buildings with older timber floors or plastered ceilings, we check fixings and deflection on survey so the partitions stay true once the building moves with the seasons.

Fire Rated Partition Walls prices in Smethwick

£75–£125 per m² + VAT

The required duration (30, 60 or 90 minutes), number of fire board layers, wall height and the extent of fire stopping around services and at the head set the price. Typical lead time: 1–3 weeks. Guide prices, supply and install — fixed after a free survey.

Price my project

Why do Smethwick businesses choose us?

Tested systems, documented

We use manufacturers' tested partition systems and hand over the relevant performance and test evidence at completion.

Penetrations planned

Services crossing the wall are coordinated in advance and sealed with tested products, which is where most fire walls actually fail in inspections.

One point of contact

A single project contact handles survey, drawings, ordering and installation, so you are not chasing different trades.

Acoustic bonus

Multi-layer fire walls are also good acoustic walls, so plant rooms and stair enclosures keep noise away from the surrounding office.

Typical fire rated partition walls projects we see in Smethwick include protected escape corridors, server, comms and plant rooms and tenancy separation walls. We follow the manufacturer's tested details for studs, boards, fixings and head, so the wall achieves the classification it is meant to have.

What specification is typical?

Test standardNon-loadbearing walls tested to BS EN 1364-1 (older data to BS 476-22)
BoardingOne to three layers of 12.5mm or 15mm fire-resistant plasterboard each side
Acoustic performanceApprox. Rw 45–55 dB depending on build-up (lab)

Covering Smethwick and nearby

Survey visits across West Midlands — including Smethwick, West Bromwich and Oldbury — are free and carry no obligation. We measure, photograph and note services so the quote is accurate first time.

In England, partition works that affect fire safety or means of escape fall under the Building Regulations, so we flag anything that may need Building Control at survey stage.

How does a Smethwick project run?

  1. Free survey

    We visit your Smethwick premises, measure up, check ceilings, floors and services and talk through how the space needs to work.

  2. Drawings and quote

    We prepare drawings and an itemised fixed price, adjusting the design until it works for your team and budget.

  3. Manufacture and planning

    Glass and components are made to the surveyed sizes while we plan access, deliveries and any out-of-hours working.

  4. Fit, check and hand over

    Installation is completed, doors and seals are adjusted, the area is cleaned and the job is signed off with you.

Fire Rated Partition Walls in Smethwick: FAQs

How soon can you start on a Smethwick project?

Typical lead time for fire rated partition walls is 1–3 weeks from signed-off drawings, mostly because materials are made to measure. Installation itself is usually a matter of days for a typical office, and we can phase work around a Smethwick office that stays open.

Can you work out of hours at our Smethwick office?

Yes. Evening and weekend installation can be arranged in Smethwick so the office keeps running. Out-of-hours working usually adds a percentage to the labour cost, which is shown clearly on the quote.

How much does a fire rated partition wall cost?

Fire rated partition walls typically cost £75–£125 per m² supplied and installed, excluding VAT. A 30-minute wall with one layer of fire board each side sits at the lower end; 60 or 90-minute walls with multiple layers and extensive fire stopping sit at the top. Fire doors are priced separately. We confirm a fixed price after a free survey.

Do fire rated walls need fire doors?

Yes. A door in a fire rated wall must be a fire door set tested to the same or appropriate rating, with compatible frame, hinges, closer, seals and signage. A standard door undermines the wall. We supply complete tested door sets and can check existing doors for suitability.

Ready to plan fire rated partition walls in Smethwick? Send a few details or call us and we will book a survey at a time that suits.

Fire Rated Partition Walls in Smethwick

Free survey, fixed written price and installation around your working hours.

Call Get a quote