Free site survey & fixed written quotesGlass, solid & demountable partitionsUK-wide installation teams
0800 088 6248
West Yorkshire · WF postcodes

Fire Rated Partition Walls in Wakefield

Businesses in Wakefield use us to plan, supply and fit fire rated partition walls — from a single glazed office to a full floor of meeting rooms. Every job starts with a free site survey and ends with a snagged, signed-off handover.

Guide £75–£125 per m² + VATLead time 1–3 weeksFree survey

Free survey in Wakefield

Tell us about the space — we'll call to book a measured survey.

Postcode area
WF
County
West Yorkshire
Region
Yorkshire and the Humber
Population (approx.)
110,000
From our Birmingham office
80 miles
Typical lead time
1–3 weeks

How do Wakefield buildings affect the install?

Business parks around Wakefield usually offer open floorplates with suspended ceilings, which suit glazed meeting rooms and full-height partitions once the ceiling void and services have been checked.

Converted buildings in and around Wakefield often bring tricky ceiling lines and out-of-square walls; site-measured glass and adjustable head tracks take care of both.

How much do fire rated partition walls cost in Wakefield?

£75–£125 per m² + VAT

The required duration (30, 60 or 90 minutes), number of fire board layers, wall height and the extent of fire stopping around services and at the head set the price. Typical lead time: 1–3 weeks. Guide prices, supply and install — fixed after a free survey.

Price my project

Why use us for fire rated partition walls in Wakefield?

Tidy, protected sites

Floors and finishes are protected, waste is removed and the area is cleaned before handover.

Penetrations planned

Services crossing the wall are coordinated in advance and sealed with tested products, which is where most fire walls actually fail in inspections.

Fixed price, in writing

Your quote lists the system, glass, doors, finishes and any extras, so the figure you approve is the figure you pay.

Handover records

You receive the system classification, fire-stopping record and photographs, giving your fire risk assessor and Building Control clear evidence of what was built.

Typical fire rated partition walls projects we see in Wakefield include stair and lift enclosures, server, comms and plant rooms and riser enclosures. Multi-layer fire walls are also good acoustic walls, so plant rooms and stair enclosures keep noise away from the surrounding office.

Key specifications

Test standardNon-loadbearing walls tested to BS EN 1364-1 (older data to BS 476-22)
FramingSteel studs 50–146mm at the system's specified centres
Fire stoppingTested collars, wraps, sealants and batts for every penetration

Do you survey in Wakefield?

From our Birmingham office (around 80 miles away) we coordinate surveys and installations throughout Yorkshire and the Humber. In Wakefield, that means a free measured survey and a written, fixed quote.

In England, partition works that affect fire safety or means of escape fall under the Building Regulations, so we flag anything that may need Building Control at survey stage.

What happens next?

  1. Measure and assess

    We take accurate measurements on site in Wakefield, check the ceiling void and floor, and agree what the new layout must achieve.

  2. Specification sign-off

    Drawings, system choice, glass and door details are confirmed in writing alongside a fixed quote.

  3. Production and logistics

    Made-to-measure panels are produced and we book deliveries, lifts and parking around your building.

  4. Fit, check and hand over

    Installation is completed, doors and seals are adjusted, the area is cleaned and the job is signed off with you.

Fire Rated Partition Walls in Wakefield: FAQs

How soon can you start on a Wakefield project?

Typical lead time for fire rated partition walls is 1–3 weeks from signed-off drawings, mostly because materials are made to measure. Installation itself is usually a matter of days for a typical office, and we can phase work around a Wakefield office that stays open.

Will our Wakefield landlord need to approve the partitions?

If you lease your Wakefield office, the lease will usually require landlord consent — often a licence for alterations — before partitions are installed. We supply drawings, specifications and method statements to support the application.

What makes a partition wall fire rated?

A partition wall is fire rated when it is built to a manufacturer's tested system, using the specified studs, fire-resistant boards, insulation, fixings and head detail, and installed exactly as tested. Every service penetration must also be fire stopped with compatible tested products. Using fire board alone does not make a wall fire rated.

Who signs off a fire rated partition wall?

Where walls affect escape routes or compartmentation, Building Control normally reviews and inspects the work. Your fire risk assessor will also want evidence for the fire risk assessment. We hand over the system classification, fire-stopping records and photographs so both can verify what was built.

Get a guide price for fire rated partition walls in Wakefield in under a minute with our quote tool, or ask for a free survey and fixed quote.

Fire Rated Partition Walls in Wakefield

Free survey, fixed written price and installation around your working hours.

Call Get a quote