Free site survey & fixed written quotesGlass, solid & demountable partitionsUK-wide installation teams
0800 088 6248
South West · Fire Rated Partition Walls

Fire Rated Partition Walls in the Bristol area

We plan and install fire rated partition walls across Bristol, from Bristol to Clifton, with a free site survey and a fixed written price before work starts.

Guide £75–£125 per m² + VATLead time 1–3 weeksFree survey

Free survey in Bristol

Tell us where the site is and we'll arrange a measured survey.

Region
South West
Nation
England
Towns listed
3
Main postcode areas
BS
Typical lead time
1–3 weeks

What should Bristol projects plan for?

Older stock across Bristol — period buildings, converted warehouses and 1960s–80s blocks — tends to have uneven floors and varied ceiling heights, which is why every quote here follows a measured survey rather than a guess.

Many Bristol workplaces are owner-occupied, which makes it easier to choose systems for the long term — acoustic glass for meeting rooms, for example, rather than the cheapest option.

How much do fire rated partition walls cost in Bristol?

£75–£125 per m² + VAT

The required duration (30, 60 or 90 minutes), number of fire board layers, wall height and the extent of fire stopping around services and at the head set the price. Typical lead time: 1–3 weeks. Guide prices, supply and install — fixed after a free survey.

Price my project

Why choose us in Bristol?

Work around your hours

Evening and weekend installation can be arranged for occupied Bristol offices, keeping disruption to a minimum.

Acoustic bonus

Multi-layer fire walls are also good acoustic walls, so plant rooms and stair enclosures keep noise away from the surrounding office.

Landlord-ready paperwork

Drawings, method statements and risk assessments are supplied for your landlord or managing agent's approval.

Penetrations planned

Services crossing the wall are coordinated in advance and sealed with tested products, which is where most fire walls actually fail in inspections.

The most common failures are not the boards but the gaps. Cables, pipes and ducts passing through the wall, sockets and back boxes, deflection heads and junctions with the façade all need fire stopping that is compatible with the wall's rating. We plan penetrations with your M&E contractor, use tested fire-stopping products and record what was installed, with photos taken before the second side is closed. At handover you receive the system classification and the fire-stopping record, which your fire risk assessor and Building Control will want to see.

Key specifications

FramingSteel studs 50–146mm at the system's specified centres
InsulationMineral wool to the system specification
Head detailTested fire-rated deflection head to accommodate slab movement
Fire stoppingTested collars, wraps, sealants and batts for every penetration

Surveys across Bristol

Survey visits across Bristol — including Bristol, Bristol and Clifton — are free and carry no obligation. We measure, photograph and note services so the quote is accurate first time.

In England, partition works that affect fire safety or means of escape fall under the Building Regulations, so we flag anything that may need Building Control at survey stage.

How does a project run?

  1. Measure and assess

    We take accurate measurements on site in Bristol, check the ceiling void and floor, and agree what the new layout must achieve.

  2. Design and fixed price

    You receive a layout, specification and a fixed, itemised quote. Nothing is ordered until you are happy with the drawings.

  3. Order and schedule

    Materials are ordered to exact sizes and we agree installation dates, working hours and site rules with you.

  4. Installation and handover

    The team installs, snags and cleans, then hands over the site with any test evidence and care guidance.

Towns we cover for fire rated partition walls in Bristol

Fire Rated Partition Walls in Bristol: FAQs

How soon can you start on a Bristol project?

Typical lead time for fire rated partition walls is 1–3 weeks from signed-off drawings, mostly because materials are made to measure. Installation itself is usually a matter of days for a typical office, and we can phase work around a Bristol office that stays open.

Can you work out of hours at our Bristol office?

Yes. Evening and weekend installation can be arranged in Bristol so the office keeps running. Out-of-hours working usually adds a percentage to the labour cost, which is shown clearly on the quote.

What makes a partition wall fire rated?

A partition wall is fire rated when it is built to a manufacturer's tested system, using the specified studs, fire-resistant boards, insulation, fixings and head detail, and installed exactly as tested. Every service penetration must also be fire stopped with compatible tested products. Using fire board alone does not make a wall fire rated.

How long does a fire rated stud wall last in a fire?

Office fire walls are commonly classified for 30, 60 or 90 minutes, such as EI 30 or EI 60. That figure is the time the tested wall maintained integrity and insulation in a standard furnace test. The duration you need is set by the building's fire strategy and Approved Document B.

Speak to us about fire rated partition walls for your Bristol premises — free survey, clear drawings and a fixed price before work starts.

Fire Rated Partition Walls in Bristol

Free survey, fixed written price and installation around your working hours.

Call Get a quote