What should Somerset projects plan for?
Converted buildings in and around Bath often bring tricky ceiling lines and out-of-square walls; site-measured glass and adjustable head tracks take care of both.
For Bath buildings with older timber floors or plastered ceilings, we check fixings and deflection on survey so the partitions stay true once the building moves with the seasons.
How much do fire rated partition walls cost in Somerset?
The required duration (30, 60 or 90 minutes), number of fire board layers, wall height and the extent of fire stopping around services and at the head set the price. Typical lead time: 1–3 weeks. Guide prices, supply and install — fixed after a free survey.
Why choose us in Somerset?
Penetrations planned
Services crossing the wall are coordinated in advance and sealed with tested products, which is where most fire walls actually fail in inspections.
Covering all of Somerset
Survey and installation teams cover Bath and the wider Somerset area, including Bath and Taunton.
Tested systems, documented
We use manufacturers' tested partition systems and hand over the relevant performance and test evidence at completion.
Acoustic bonus
Multi-layer fire walls are also good acoustic walls, so plant rooms and stair enclosures keep noise away from the surrounding office.
The most common failures are not the boards but the gaps. Cables, pipes and ducts passing through the wall, sockets and back boxes, deflection heads and junctions with the façade all need fire stopping that is compatible with the wall's rating. We plan penetrations with your M&E contractor, use tested fire-stopping products and record what was installed, with photos taken before the second side is closed. At handover you receive the system classification and the fire-stopping record, which your fire risk assessor and Building Control will want to see.
Key specifications
| Test standard | Non-loadbearing walls tested to BS EN 1364-1 (older data to BS 476-22) |
|---|---|
| Framing | Steel studs 50–146mm at the system's specified centres |
| Boarding | One to three layers of 12.5mm or 15mm fire-resistant plasterboard each side |
| Insulation | Mineral wool to the system specification |
Surveys across Somerset
Survey visits across Somerset — including Bath, Bath and Taunton — are free and carry no obligation. We measure, photograph and note services so the quote is accurate first time.
In England, partition works that affect fire safety or means of escape fall under the Building Regulations, so we flag anything that may need Building Control at survey stage.
How does a project run?
Book a survey
A member of the team measures the Bath office, notes access and services, and discusses layout, privacy and acoustics with you.
Drawings and quote
We prepare drawings and an itemised fixed price, adjusting the design until it works for your team and budget.
Manufacture and planning
Glass and components are made to the surveyed sizes while we plan access, deliveries and any out-of-hours working.
Installation and handover
The team installs, snags and cleans, then hands over the site with any test evidence and care guidance.
Towns we cover for fire rated partition walls in Somerset
- Fire Rated Partition Walls in Bath
- Fire Rated Partition Walls in Taunton
- Fire Rated Partition Walls in Weston-super-Mare
- Fire Rated Partition Walls in Yeovil
- Fire Rated Partition Walls in Bridgwater
- Fire Rated Partition Walls in Frome
- Fire Rated Partition Walls in Wells
- Fire Rated Partition Walls in Clevedon
Fire Rated Partition Walls in Somerset: FAQs
Do you install fire rated partition walls in Bath?
Yes. We survey, supply and install fire rated partition walls throughout Bath and the wider Somerset area, including Bath and Taunton. The survey is free and you receive a fixed, written quote before any work is booked.
How soon can you start on a Bath project?
Typical lead time for fire rated partition walls is 1–3 weeks from signed-off drawings, mostly because materials are made to measure. Installation itself is usually a matter of days for a typical office, and we can phase work around a Bath office that stays open.
How long does a fire rated stud wall last in a fire?
Office fire walls are commonly classified for 30, 60 or 90 minutes, such as EI 30 or EI 60. That figure is the time the tested wall maintained integrity and insulation in a standard furnace test. The duration you need is set by the building's fire strategy and Approved Document B.
Who signs off a fire rated partition wall?
Where walls affect escape routes or compartmentation, Building Control normally reviews and inspects the work. Your fire risk assessor will also want evidence for the fire risk assessment. We hand over the system classification, fire-stopping records and photographs so both can verify what was built.
Whether your Bath project is a single room or a whole floor, we will survey, design and install your fire rated partition walls with one team.