- Postcode area
- CH
- County
- Clwyd
- Region
- Wales
- Population (approx.)
- 26,000
- From our Birmingham office
- 69 miles
- Typical lead time
- 1–3 weeks
What should Flint offices plan for?
For Flint businesses that share a building, we keep noise, dust and deliveries to agreed windows so neighbours are not disturbed.
A small team in Flint usually wants the job done quickly and tidily; most compact installations are finished in one or two days once the glass or boards are ready.
How much do fire rated partition walls cost in Flint?
The required duration (30, 60 or 90 minutes), number of fire board layers, wall height and the extent of fire stopping around services and at the head set the price. Typical lead time: 1–3 weeks. Guide prices, supply and install — fixed after a free survey.
Why do Flint businesses choose us?
One point of contact
A single project contact handles survey, drawings, ordering and installation, so you are not chasing different trades.
Built to the tested system
We follow the manufacturer's tested details for studs, boards, fixings and head, so the wall achieves the classification it is meant to have.
Work around your hours
Evening and weekend installation can be arranged for occupied Flint offices, keeping disruption to a minimum.
Handover records
You receive the system classification, fire-stopping record and photographs, giving your fire risk assessor and Building Control clear evidence of what was built.
Typical fire rated partition walls projects we see in Flint include stair and lift enclosures, server, comms and plant rooms and tenancy separation walls. Multi-layer fire walls are also good acoustic walls, so plant rooms and stair enclosures keep noise away from the surrounding office.
Key specifications
| Classification | EI 30, EI 60 or EI 90 integrity and insulation, to the tested system |
|---|---|
| Test standard | Non-loadbearing walls tested to BS EN 1364-1 (older data to BS 476-22) |
| Framing | Steel studs 50–146mm at the system's specified centres |
Do you survey in Flint?
Survey visits across Clwyd — including Flint, Deeside and Mold — are free and carry no obligation. We measure, photograph and note services so the quote is accurate first time.
In Wales, the Building Regulations apply with Welsh-specific guidance, so we flag anything that may need Building Control — usually fire or escape-route changes — at survey stage.
What happens next?
Measure and assess
We take accurate measurements on site in Flint, check the ceiling void and floor, and agree what the new layout must achieve.
Specification sign-off
Drawings, system choice, glass and door details are confirmed in writing alongside a fixed quote.
Manufacture and planning
Glass and components are made to the surveyed sizes while we plan access, deliveries and any out-of-hours working.
Fit, check and hand over
Installation is completed, doors and seals are adjusted, the area is cleaned and the job is signed off with you.
Flint fire rated partition walls FAQs
How much do fire rated partition walls cost in Flint?
Our guide price for fire rated partition walls is £75–£125 per m², supply and install, excluding VAT. The final price for a Flint project depends on the measured size, doors, glass or board specification and access, and is fixed after the free survey.
How soon can you start on a Flint project?
Typical lead time for fire rated partition walls is 1–3 weeks from signed-off drawings, mostly because materials are made to measure. Installation itself is usually a matter of days for a typical office, and we can phase work around a Flint office that stays open.
What makes a partition wall fire rated?
A partition wall is fire rated when it is built to a manufacturer's tested system, using the specified studs, fire-resistant boards, insulation, fixings and head detail, and installed exactly as tested. Every service penetration must also be fire stopped with compatible tested products. Using fire board alone does not make a wall fire rated.
Who signs off a fire rated partition wall?
Where walls affect escape routes or compartmentation, Building Control normally reviews and inspects the work. Your fire risk assessor will also want evidence for the fire risk assessment. We hand over the system classification, fire-stopping records and photographs so both can verify what was built.
Tell us about your Flint office and we will arrange a free survey and a fixed, written quote for your fire rated partition walls.
