How do Exeter buildings affect the install?
Converted buildings in and around Exeter often bring tricky ceiling lines and out-of-square walls; site-measured glass and adjustable head tracks take care of both.
Where a Exeter building has a managing agent, we provide method statements, risk assessments and drawings in advance so the licence for alterations is not held up.
How much do fire rated partition walls cost in Exeter?
The required duration (30, 60 or 90 minutes), number of fire board layers, wall height and the extent of fire stopping around services and at the head set the price. Typical lead time: 1–3 weeks. Guide prices, supply and install — fixed after a free survey.
What do you get with us in Exeter?
One point of contact
A single project contact handles survey, drawings, ordering and installation, so you are not chasing different trades.
Landlord-ready paperwork
Drawings, method statements and risk assessments are supplied for your landlord or managing agent's approval.
Acoustic bonus
Multi-layer fire walls are also good acoustic walls, so plant rooms and stair enclosures keep noise away from the surrounding office.
Handover records
You receive the system classification, fire-stopping record and photographs, giving your fire risk assessor and Building Control clear evidence of what was built.
Typical fire rated partition walls projects we see in Exeter include stair and lift enclosures, tenancy separation walls and kitchens and storage rooms. Services crossing the wall are coordinated in advance and sealed with tested products, which is where most fire walls actually fail in inspections.
Key specifications
| Classification | EI 30, EI 60 or EI 90 integrity and insulation, to the tested system |
|---|---|
| Test standard | Non-loadbearing walls tested to BS EN 1364-1 (older data to BS 476-22) |
| Insulation | Mineral wool to the system specification |
Covering Exeter and nearby
Our office is in Great Barr, Birmingham — roughly 144 miles from Exeter as the crow flies — and survey and installation teams are arranged regionally, so distance does not change the price structure.
In England, partition works that affect fire safety or means of escape fall under the Building Regulations, so we flag anything that may need Building Control at survey stage.
How does a Exeter project run?
Book a survey
A member of the team measures the Exeter office, notes access and services, and discusses layout, privacy and acoustics with you.
Drawings and quote
We prepare drawings and an itemised fixed price, adjusting the design until it works for your team and budget.
Manufacture and planning
Glass and components are made to the surveyed sizes while we plan access, deliveries and any out-of-hours working.
Fit, check and hand over
Installation is completed, doors and seals are adjusted, the area is cleaned and the job is signed off with you.
Fire Rated Partition Walls in Exeter: FAQs
How soon can you start on a Exeter project?
Typical lead time for fire rated partition walls is 1–3 weeks from signed-off drawings, mostly because materials are made to measure. Installation itself is usually a matter of days for a typical office, and we can phase work around a Exeter office that stays open.
Can you work out of hours at our Exeter office?
Yes. Evening and weekend installation can be arranged in Exeter so the office keeps running. Out-of-hours working usually adds a percentage to the labour cost, which is shown clearly on the quote.
What makes a partition wall fire rated?
A partition wall is fire rated when it is built to a manufacturer's tested system, using the specified studs, fire-resistant boards, insulation, fixings and head detail, and installed exactly as tested. Every service penetration must also be fire stopped with compatible tested products. Using fire board alone does not make a wall fire rated.
How long does a fire rated stud wall last in a fire?
Office fire walls are commonly classified for 30, 60 or 90 minutes, such as EI 30 or EI 60. That figure is the time the tested wall maintained integrity and insulation in a standard furnace test. The duration you need is set by the building's fire strategy and Approved Document B.
Tell us about your Exeter office and we will arrange a free survey and a fixed, written quote for your fire rated partition walls.