What should Devon projects plan for?
Converted buildings in and around Exeter often bring tricky ceiling lines and out-of-square walls; site-measured glass and adjustable head tracks take care of both.
For Exeter buildings with older timber floors or plastered ceilings, we check fixings and deflection on survey so the partitions stay true once the building moves with the seasons.
How much do fire rated partition walls cost in Devon?
The required duration (30, 60 or 90 minutes), number of fire board layers, wall height and the extent of fire stopping around services and at the head set the price. Typical lead time: 1–3 weeks. Guide prices, supply and install — fixed after a free survey.
Why choose us in Devon?
Penetrations planned
Services crossing the wall are coordinated in advance and sealed with tested products, which is where most fire walls actually fail in inspections.
Clear guide prices online
Our fire rated partition walls prices are published as guide ranges, so you can budget before the survey.
Landlord-ready paperwork
Drawings, method statements and risk assessments are supplied for your landlord or managing agent's approval.
Handover records
You receive the system classification, fire-stopping record and photographs, giving your fire risk assessor and Building Control clear evidence of what was built.
The most common failures are not the boards but the gaps. Cables, pipes and ducts passing through the wall, sockets and back boxes, deflection heads and junctions with the façade all need fire stopping that is compatible with the wall's rating. We plan penetrations with your M&E contractor, use tested fire-stopping products and record what was installed, with photos taken before the second side is closed. At handover you receive the system classification and the fire-stopping record, which your fire risk assessor and Building Control will want to see.
Key specifications
| Test standard | Non-loadbearing walls tested to BS EN 1364-1 (older data to BS 476-22) |
|---|---|
| Boarding | One to three layers of 12.5mm or 15mm fire-resistant plasterboard each side |
| Insulation | Mineral wool to the system specification |
| Acoustic performance | Approx. Rw 45–55 dB depending on build-up (lab) |
Surveys across Devon
We cover Exeter along with nearby Exeter, Plymouth and Torquay. Surveys are free and usually take under an hour for a typical office floor.
In England, partition works that affect fire safety or means of escape fall under the Building Regulations, so we flag anything that may need Building Control at survey stage.
How does a project run?
Measure and assess
We take accurate measurements on site in Exeter, check the ceiling void and floor, and agree what the new layout must achieve.
Specification sign-off
Drawings, system choice, glass and door details are confirmed in writing alongside a fixed quote.
Manufacture and planning
Glass and components are made to the surveyed sizes while we plan access, deliveries and any out-of-hours working.
Fit, check and hand over
Installation is completed, doors and seals are adjusted, the area is cleaned and the job is signed off with you.
Towns we cover for fire rated partition walls in Devon
- Fire Rated Partition Walls in Exeter
- Fire Rated Partition Walls in Plymouth
- Fire Rated Partition Walls in Torquay
- Fire Rated Partition Walls in Paignton
- Fire Rated Partition Walls in Barnstaple
- Fire Rated Partition Walls in Newton Abbot
- Fire Rated Partition Walls in Exmouth
- Fire Rated Partition Walls in Tiverton
Fire Rated Partition Walls in Devon: FAQs
Do you install fire rated partition walls in Exeter?
Yes. We survey, supply and install fire rated partition walls throughout Exeter and the wider Devon area, including Exeter and Plymouth. The survey is free and you receive a fixed, written quote before any work is booked.
How soon can you start on a Exeter project?
Typical lead time for fire rated partition walls is 1–3 weeks from signed-off drawings, mostly because materials are made to measure. Installation itself is usually a matter of days for a typical office, and we can phase work around a Exeter office that stays open.
How much does a fire rated partition wall cost?
Fire rated partition walls typically cost £75–£125 per m² supplied and installed, excluding VAT. A 30-minute wall with one layer of fire board each side sits at the lower end; 60 or 90-minute walls with multiple layers and extensive fire stopping sit at the top. Fire doors are priced separately. We confirm a fixed price after a free survey.
Who signs off a fire rated partition wall?
Where walls affect escape routes or compartmentation, Building Control normally reviews and inspects the work. Your fire risk assessor will also want evidence for the fire risk assessment. We hand over the system classification, fire-stopping records and photographs so both can verify what was built.
Tell us about your Exeter office and we will arrange a free survey and a fixed, written quote for your fire rated partition walls.