Free site survey & fixed written quotesGlass, solid & demountable partitionsUK-wide installation teams
0800 088 6248
Yorkshire and the Humber · Fire Rated Partition Walls

Fire Rated Partition Walls in East Riding of Yorkshire

Whether you are in Hull, Beverley or a smaller East Riding of Yorkshire town, we survey, supply and install fire rated partition walls to suit the building and the way your team works.

Guide £75–£125 per m² + VATLead time 1–3 weeksFree survey

Free survey in East Riding of Yorkshire

Tell us where the site is and we'll arrange a measured survey.

Region
Yorkshire and the Humber
Nation
England
Towns listed
5
Main postcode areas
DN, HU, YO
Typical lead time
1–3 weeks

What should East Riding of Yorkshire projects plan for?

Workplaces near Hull often combine office space with storage or production, which is where solid stud walls, in-plant offices and glazed screens work well together.

Many Hull workplaces are owner-occupied, which makes it easier to choose systems for the long term — acoustic glass for meeting rooms, for example, rather than the cheapest option.

How much do fire rated partition walls cost in East Riding of Yorkshire?

£75–£125 per m² + VAT

The required duration (30, 60 or 90 minutes), number of fire board layers, wall height and the extent of fire stopping around services and at the head set the price. Typical lead time: 1–3 weeks. Guide prices, supply and install — fixed after a free survey.

Price my project

Why choose us in East Riding of Yorkshire?

Penetrations planned

Services crossing the wall are coordinated in advance and sealed with tested products, which is where most fire walls actually fail in inspections.

Snagging and aftercare

We return to adjust doors and closers after the building settles, and repairs or alterations are only a call away.

Handover records

You receive the system classification, fire-stopping record and photographs, giving your fire risk assessor and Building Control clear evidence of what was built.

Clear guide prices online

Our fire rated partition walls prices are published as guide ranges, so you can budget before the survey.

The most common failures are not the boards but the gaps. Cables, pipes and ducts passing through the wall, sockets and back boxes, deflection heads and junctions with the façade all need fire stopping that is compatible with the wall's rating. We plan penetrations with your M&E contractor, use tested fire-stopping products and record what was installed, with photos taken before the second side is closed. At handover you receive the system classification and the fire-stopping record, which your fire risk assessor and Building Control will want to see.

Key specifications

ClassificationEI 30, EI 60 or EI 90 integrity and insulation, to the tested system
FramingSteel studs 50–146mm at the system's specified centres
Fire stoppingTested collars, wraps, sealants and batts for every penetration
Acoustic performanceApprox. Rw 45–55 dB depending on build-up (lab)

Surveys across East Riding of Yorkshire

We cover Hull along with nearby Hull, Beverley and Bridlington. Surveys are free and usually take under an hour for a typical office floor.

In England, partition works that affect fire safety or means of escape fall under the Building Regulations, so we flag anything that may need Building Control at survey stage.

How does a project run?

  1. Measure and assess

    We take accurate measurements on site in Hull, check the ceiling void and floor, and agree what the new layout must achieve.

  2. Specification sign-off

    Drawings, system choice, glass and door details are confirmed in writing alongside a fixed quote.

  3. Manufacture and planning

    Glass and components are made to the surveyed sizes while we plan access, deliveries and any out-of-hours working.

  4. Fit, check and hand over

    Installation is completed, doors and seals are adjusted, the area is cleaned and the job is signed off with you.

Towns we cover for fire rated partition walls in East Riding of Yorkshire

Fire Rated Partition Walls in East Riding of Yorkshire: FAQs

Can you work out of hours at our Hull office?

Yes. Evening and weekend installation can be arranged in Hull so the office keeps running. Out-of-hours working usually adds a percentage to the labour cost, which is shown clearly on the quote.

Do you cover areas near Hull?

Yes. As well as Hull we regularly cover Hull, Beverley and Bridlington, plus the rest of East Riding of Yorkshire and Yorkshire and the Humber. Survey and installation teams are arranged regionally.

Do fire rated walls need fire doors?

Yes. A door in a fire rated wall must be a fire door set tested to the same or appropriate rating, with compatible frame, hinges, closer, seals and signage. A standard door undermines the wall. We supply complete tested door sets and can check existing doors for suitability.

Who signs off a fire rated partition wall?

Where walls affect escape routes or compartmentation, Building Control normally reviews and inspects the work. Your fire risk assessor will also want evidence for the fire risk assessment. We hand over the system classification, fire-stopping records and photographs so both can verify what was built.

Speak to us about fire rated partition walls for your Hull premises — free survey, clear drawings and a fixed price before work starts.

Fire Rated Partition Walls in East Riding of Yorkshire

Free survey, fixed written price and installation around your working hours.

Call Get a quote