- Postcode area
- HU
- County
- East Riding of Yorkshire
- Region
- Yorkshire and the Humber
- From our Birmingham office
- 105 miles
- Typical lead time
- 1–3 weeks
What should Hull offices plan for?
For Hull businesses that share a building, we keep noise, dust and deliveries to agreed windows so neighbours are not disturbed.
Workplaces near Hull often combine office space with storage or production, which is where solid stud walls, in-plant offices and glazed screens work well together.
Fire Rated Partition Walls prices in Hull
The required duration (30, 60 or 90 minutes), number of fire board layers, wall height and the extent of fire stopping around services and at the head set the price. Typical lead time: 1–3 weeks. Guide prices, supply and install — fixed after a free survey.
Why use us for fire rated partition walls in Hull?
Clear guide prices online
Our fire rated partition walls prices are published as guide ranges, so you can budget before the survey.
Built to the tested system
We follow the manufacturer's tested details for studs, boards, fixings and head, so the wall achieves the classification it is meant to have.
Penetrations planned
Services crossing the wall are coordinated in advance and sealed with tested products, which is where most fire walls actually fail in inspections.
Snagging and aftercare
We return to adjust doors and closers after the building settles, and repairs or alterations are only a call away.
Typical fire rated partition walls projects we see in Hull include riser enclosures, tenancy separation walls and kitchens and storage rooms. You receive the system classification, fire-stopping record and photographs, giving your fire risk assessor and Building Control clear evidence of what was built.
Key specifications
| Classification | EI 30, EI 60 or EI 90 integrity and insulation, to the tested system |
|---|---|
| Test standard | Non-loadbearing walls tested to BS EN 1364-1 (older data to BS 476-22) |
| Acoustic performance | Approx. Rw 45–55 dB depending on build-up (lab) |
Covering Hull and nearby
Hull sits about 105 miles from our Birmingham base. Surveys are booked at a time that suits you, including early mornings, and the same project contact stays with you through to installation.
In England, partition works that affect fire safety or means of escape fall under the Building Regulations, so we flag anything that may need Building Control at survey stage.
What happens next?
Free survey
We visit your Hull premises, measure up, check ceilings, floors and services and talk through how the space needs to work.
Design and fixed price
You receive a layout, specification and a fixed, itemised quote. Nothing is ordered until you are happy with the drawings.
Manufacture and planning
Glass and components are made to the surveyed sizes while we plan access, deliveries and any out-of-hours working.
Install and sign-off
We fit the partitions with minimal disruption, complete snagging and walk you through the finished space.
Hull fire rated partition walls FAQs
How much do fire rated partition walls cost in Hull?
Our guide price for fire rated partition walls is £75–£125 per m², supply and install, excluding VAT. The final price for a Hull project depends on the measured size, doors, glass or board specification and access, and is fixed after the free survey.
How soon can you start on a Hull project?
Typical lead time for fire rated partition walls is 1–3 weeks from signed-off drawings, mostly because materials are made to measure. Installation itself is usually a matter of days for a typical office, and we can phase work around a Hull office that stays open.
How much does a fire rated partition wall cost?
Fire rated partition walls typically cost £75–£125 per m² supplied and installed, excluding VAT. A 30-minute wall with one layer of fire board each side sits at the lower end; 60 or 90-minute walls with multiple layers and extensive fire stopping sit at the top. Fire doors are priced separately. We confirm a fixed price after a free survey.
What makes a partition wall fire rated?
A partition wall is fire rated when it is built to a manufacturer's tested system, using the specified studs, fire-resistant boards, insulation, fixings and head detail, and installed exactly as tested. Every service penetration must also be fire stopped with compatible tested products. Using fire board alone does not make a wall fire rated.
Get a guide price for fire rated partition walls in Hull in under a minute with our quote tool, or ask for a free survey and fixed quote.