How do Ealing buildings affect the install?
City-centre floors in Ealing often come with raised access floors, high suspended ceilings and busy shared lobbies, so we plan deliveries, lift bookings and permits with the building manager before the team arrives.
Parking and loading in central Ealing can be restricted, so glass deliveries are booked into agreed slots and panels are sized to fit the lifts and stairwells we measured on survey.
What do fire rated partition walls cost in Ealing?
The required duration (30, 60 or 90 minutes), number of fire board layers, wall height and the extent of fire stopping around services and at the head set the price. Typical lead time: 1–3 weeks. Guide prices, supply and install — fixed after a free survey.
Why do Ealing businesses choose us?
Tested systems, documented
We use manufacturers' tested partition systems and hand over the relevant performance and test evidence at completion.
Acoustic bonus
Multi-layer fire walls are also good acoustic walls, so plant rooms and stair enclosures keep noise away from the surrounding office.
Clear guide prices online
Our fire rated partition walls prices are published as guide ranges, so you can budget before the survey.
Built to the tested system
We follow the manufacturer's tested details for studs, boards, fixings and head, so the wall achieves the classification it is meant to have.
Typical fire rated partition walls projects we see in Ealing include protected escape corridors, tenancy separation walls and kitchens and storage rooms. You receive the system classification, fire-stopping record and photographs, giving your fire risk assessor and Building Control clear evidence of what was built.
Specification highlights
| Framing | Steel studs 50–146mm at the system's specified centres |
|---|---|
| Boarding | One to three layers of 12.5mm or 15mm fire-resistant plasterboard each side |
| Insulation | Mineral wool to the system specification |
Do you survey in Ealing?
If you are in Ealing or close by in Hammersmith or Kingston upon Thames, book a free survey and we will come and measure. You will receive drawings and a fixed price before you commit to anything.
In England, partition works that affect fire safety or means of escape fall under the Building Regulations, so we flag anything that may need Building Control at survey stage.
How does a Ealing project run?
Free survey
We visit your Ealing premises, measure up, check ceilings, floors and services and talk through how the space needs to work.
Specification sign-off
Drawings, system choice, glass and door details are confirmed in writing alongside a fixed quote.
Order and schedule
Materials are ordered to exact sizes and we agree installation dates, working hours and site rules with you.
Install and sign-off
We fit the partitions with minimal disruption, complete snagging and walk you through the finished space.
Fire Rated Partition Walls in Ealing: FAQs
Will our Ealing landlord need to approve the partitions?
If you lease your Ealing office, the lease will usually require landlord consent — often a licence for alterations — before partitions are installed. We supply drawings, specifications and method statements to support the application.
Do you cover areas near Ealing?
Yes. As well as Ealing we regularly cover Hammersmith, Harrow and Kingston upon Thames, plus the rest of Greater London and London. Survey and installation teams are arranged regionally.
How much does a fire rated partition wall cost?
Fire rated partition walls typically cost £75–£125 per m² supplied and installed, excluding VAT. A 30-minute wall with one layer of fire board each side sits at the lower end; 60 or 90-minute walls with multiple layers and extensive fire stopping sit at the top. Fire doors are priced separately. We confirm a fixed price after a free survey.
How long does a fire rated stud wall last in a fire?
Office fire walls are commonly classified for 30, 60 or 90 minutes, such as EI 30 or EI 60. That figure is the time the tested wall maintained integrity and insulation in a standard furnace test. The duration you need is set by the building's fire strategy and Approved Document B.
Tell us about your Ealing office and we will arrange a free survey and a fixed, written quote for your fire rated partition walls.