Free site survey & fixed written quotesGlass, solid & demountable partitionsUK-wide installation teams
0800 088 6248
London · Fire Rated Partition Walls

Fire Rated Partition Walls in Greater London

From city offices to business parks and converted buildings, we provide fire rated partition walls throughout Greater London and the wider London region.

Guide £75–£125 per m² + VATLead time 1–3 weeksFree survey

Free survey in Greater London

Tell us where the site is and we'll arrange a measured survey.

Region
London
Nation
England
Towns listed
16
Main postcode areas
BR, CR, E, EC, EN
Typical lead time
1–3 weeks

What should Greater London projects plan for?

In a city like City of London, out-of-hours working is often the difference between a smooth install and a lost week. We regularly phase work over evenings and weekends to keep occupied floors running.

Offices in City of London range from first-floor suites above the high street to modern units on the edge of town, and the right partition system depends as much on the building as on the budget.

How much do fire rated partition walls cost in Greater London?

£75–£125 per m² + VAT

The required duration (30, 60 or 90 minutes), number of fire board layers, wall height and the extent of fire stopping around services and at the head set the price. Typical lead time: 1–3 weeks. Guide prices, supply and install — fixed after a free survey.

Price my project

Why choose us in Greater London?

Landlord-ready paperwork

Drawings, method statements and risk assessments are supplied for your landlord or managing agent's approval.

Free survey in City of London

We measure the space, check ceilings, floors and services, and talk through how you want the office to work before anything is priced.

Handover records

You receive the system classification, fire-stopping record and photographs, giving your fire risk assessor and Building Control clear evidence of what was built.

Built to the tested system

We follow the manufacturer's tested details for studs, boards, fixings and head, so the wall achieves the classification it is meant to have.

The most common failures are not the boards but the gaps. Cables, pipes and ducts passing through the wall, sockets and back boxes, deflection heads and junctions with the façade all need fire stopping that is compatible with the wall's rating. We plan penetrations with your M&E contractor, use tested fire-stopping products and record what was installed, with photos taken before the second side is closed. At handover you receive the system classification and the fire-stopping record, which your fire risk assessor and Building Control will want to see.

Key specifications

ClassificationEI 30, EI 60 or EI 90 integrity and insulation, to the tested system
Test standardNon-loadbearing walls tested to BS EN 1364-1 (older data to BS 476-22)
BoardingOne to three layers of 12.5mm or 15mm fire-resistant plasterboard each side
Head detailTested fire-rated deflection head to accommodate slab movement

Surveys across Greater London

Survey visits across Greater London — including City of London, City of London and Westminster — are free and carry no obligation. We measure, photograph and note services so the quote is accurate first time.

In England, partition works that affect fire safety or means of escape fall under the Building Regulations, so we flag anything that may need Building Control at survey stage.

How does a project run?

  1. Measure and assess

    We take accurate measurements on site in City of London, check the ceiling void and floor, and agree what the new layout must achieve.

  2. Drawings and quote

    We prepare drawings and an itemised fixed price, adjusting the design until it works for your team and budget.

  3. Production and logistics

    Made-to-measure panels are produced and we book deliveries, lifts and parking around your building.

  4. Fit, check and hand over

    Installation is completed, doors and seals are adjusted, the area is cleaned and the job is signed off with you.

Towns we cover for fire rated partition walls in Greater London

Fire Rated Partition Walls in Greater London: FAQs

How soon can you start on a City of London project?

Typical lead time for fire rated partition walls is 1–3 weeks from signed-off drawings, mostly because materials are made to measure. Installation itself is usually a matter of days for a typical office, and we can phase work around a City of London office that stays open.

Do you cover areas near City of London?

Yes. As well as City of London we regularly cover City of London, Westminster and Canary Wharf, plus the rest of Greater London and London. Survey and installation teams are arranged regionally.

What makes a partition wall fire rated?

A partition wall is fire rated when it is built to a manufacturer's tested system, using the specified studs, fire-resistant boards, insulation, fixings and head detail, and installed exactly as tested. Every service penetration must also be fire stopped with compatible tested products. Using fire board alone does not make a wall fire rated.

Who signs off a fire rated partition wall?

Where walls affect escape routes or compartmentation, Building Control normally reviews and inspects the work. Your fire risk assessor will also want evidence for the fire risk assessment. We hand over the system classification, fire-stopping records and photographs so both can verify what was built.

Tell us about your City of London office and we will arrange a free survey and a fixed, written quote for your fire rated partition walls.

Fire Rated Partition Walls in Greater London

Free survey, fixed written price and installation around your working hours.

Call Get a quote