- Postcode area
- E
- County
- Greater London
- Region
- London
- Population (approx.)
- 37,000
- From our Birmingham office
- 108 miles
- Typical lead time
- 1–3 weeks
What should Stratford offices plan for?
Many Stratford occupiers are on shorter leases or flexible terms, so we talk through demountable options and dilapidations at the start rather than leaving them for the end of the lease.
Parking and loading in central Stratford can be restricted, so glass deliveries are booked into agreed slots and panels are sized to fit the lifts and stairwells we measured on survey.
What do fire rated partition walls cost in Stratford?
The required duration (30, 60 or 90 minutes), number of fire board layers, wall height and the extent of fire stopping around services and at the head set the price. Typical lead time: 1–3 weeks. Guide prices, supply and install — fixed after a free survey.
Why use us for fire rated partition walls in Stratford?
Penetrations planned
Services crossing the wall are coordinated in advance and sealed with tested products, which is where most fire walls actually fail in inspections.
Clear guide prices online
Our fire rated partition walls prices are published as guide ranges, so you can budget before the survey.
Work around your hours
Evening and weekend installation can be arranged for occupied Stratford offices, keeping disruption to a minimum.
Handover records
You receive the system classification, fire-stopping record and photographs, giving your fire risk assessor and Building Control clear evidence of what was built.
Typical fire rated partition walls projects we see in Stratford include protected escape corridors, tenancy separation walls and kitchens and storage rooms. We follow the manufacturer's tested details for studs, boards, fixings and head, so the wall achieves the classification it is meant to have.
Key specifications
| Framing | Steel studs 50–146mm at the system's specified centres |
|---|---|
| Head detail | Tested fire-rated deflection head to accommodate slab movement |
| Fire stopping | Tested collars, wraps, sealants and batts for every penetration |
How do surveys work in Stratford?
If you are in Stratford or close by in Canary Wharf or City of London, book a free survey and we will come and measure. You will receive drawings and a fixed price before you commit to anything.
In England, partition works that affect fire safety or means of escape fall under the Building Regulations, so we flag anything that may need Building Control at survey stage.
How does a Stratford project run?
Free survey
We visit your Stratford premises, measure up, check ceilings, floors and services and talk through how the space needs to work.
Design and fixed price
You receive a layout, specification and a fixed, itemised quote. Nothing is ordered until you are happy with the drawings.
Manufacture and planning
Glass and components are made to the surveyed sizes while we plan access, deliveries and any out-of-hours working.
Fit, check and hand over
Installation is completed, doors and seals are adjusted, the area is cleaned and the job is signed off with you.
Stratford fire rated partition walls FAQs
How soon can you start on a Stratford project?
Typical lead time for fire rated partition walls is 1–3 weeks from signed-off drawings, mostly because materials are made to measure. Installation itself is usually a matter of days for a typical office, and we can phase work around a Stratford office that stays open.
Will our Stratford landlord need to approve the partitions?
If you lease your Stratford office, the lease will usually require landlord consent — often a licence for alterations — before partitions are installed. We supply drawings, specifications and method statements to support the application.
How much does a fire rated partition wall cost?
Fire rated partition walls typically cost £75–£125 per m² supplied and installed, excluding VAT. A 30-minute wall with one layer of fire board each side sits at the lower end; 60 or 90-minute walls with multiple layers and extensive fire stopping sit at the top. Fire doors are priced separately. We confirm a fixed price after a free survey.
Who signs off a fire rated partition wall?
Where walls affect escape routes or compartmentation, Building Control normally reviews and inspects the work. Your fire risk assessor will also want evidence for the fire risk assessment. We hand over the system classification, fire-stopping records and photographs so both can verify what was built.
Tell us about your Stratford office and we will arrange a free survey and a fixed, written quote for your fire rated partition walls.
