- Region
- South East
- Nation
- England
- Towns listed
- 10
- Main postcode areas
- GU, PO, RG, SO, SP
- Typical lead time
- 1–3 weeks
What should Hampshire projects plan for?
Parking and loading in central Southampton can be restricted, so glass deliveries are booked into agreed slots and panels are sized to fit the lifts and stairwells we measured on survey.
Smaller floorplates in Southampton make every metre count, so we often recommend glass that keeps daylight moving across the office while still giving managers a private room.
How much do fire rated partition walls cost in Hampshire?
The required duration (30, 60 or 90 minutes), number of fire board layers, wall height and the extent of fire stopping around services and at the head set the price. Typical lead time: 1–3 weeks. Guide prices, supply and install — fixed after a free survey.
Why choose us in Hampshire?
Tested systems, documented
We use manufacturers' tested partition systems and hand over the relevant performance and test evidence at completion.
Acoustic bonus
Multi-layer fire walls are also good acoustic walls, so plant rooms and stair enclosures keep noise away from the surrounding office.
Built to the tested system
We follow the manufacturer's tested details for studs, boards, fixings and head, so the wall achieves the classification it is meant to have.
Landlord-ready paperwork
Drawings, method statements and risk assessments are supplied for your landlord or managing agent's approval.
The most common failures are not the boards but the gaps. Cables, pipes and ducts passing through the wall, sockets and back boxes, deflection heads and junctions with the façade all need fire stopping that is compatible with the wall's rating. We plan penetrations with your M&E contractor, use tested fire-stopping products and record what was installed, with photos taken before the second side is closed. At handover you receive the system classification and the fire-stopping record, which your fire risk assessor and Building Control will want to see.
Key specifications
| Framing | Steel studs 50–146mm at the system's specified centres |
|---|---|
| Boarding | One to three layers of 12.5mm or 15mm fire-resistant plasterboard each side |
| Insulation | Mineral wool to the system specification |
| Fire stopping | Tested collars, wraps, sealants and batts for every penetration |
Surveys across Hampshire
We cover Southampton along with nearby Southampton, Portsmouth and Winchester. Surveys are free and usually take under an hour for a typical office floor.
In England, partition works that affect fire safety or means of escape fall under the Building Regulations, so we flag anything that may need Building Control at survey stage.
How does a project run?
Free survey
We visit your Southampton premises, measure up, check ceilings, floors and services and talk through how the space needs to work.
Design and fixed price
You receive a layout, specification and a fixed, itemised quote. Nothing is ordered until you are happy with the drawings.
Manufacture and planning
Glass and components are made to the surveyed sizes while we plan access, deliveries and any out-of-hours working.
Fit, check and hand over
Installation is completed, doors and seals are adjusted, the area is cleaned and the job is signed off with you.
Towns we cover for fire rated partition walls in Hampshire
- Fire Rated Partition Walls in Southampton
- Fire Rated Partition Walls in Portsmouth
- Fire Rated Partition Walls in Winchester
- Fire Rated Partition Walls in Basingstoke
- Fire Rated Partition Walls in Fareham
- Fire Rated Partition Walls in Eastleigh
- Fire Rated Partition Walls in Andover
- Fire Rated Partition Walls in Aldershot
- Fire Rated Partition Walls in Farnborough
- Fire Rated Partition Walls in Havant
Fire Rated Partition Walls in Hampshire: FAQs
How soon can you start on a Southampton project?
Typical lead time for fire rated partition walls is 1–3 weeks from signed-off drawings, mostly because materials are made to measure. Installation itself is usually a matter of days for a typical office, and we can phase work around a Southampton office that stays open.
Will our Southampton landlord need to approve the partitions?
If you lease your Southampton office, the lease will usually require landlord consent — often a licence for alterations — before partitions are installed. We supply drawings, specifications and method statements to support the application.
What makes a partition wall fire rated?
A partition wall is fire rated when it is built to a manufacturer's tested system, using the specified studs, fire-resistant boards, insulation, fixings and head detail, and installed exactly as tested. Every service penetration must also be fire stopped with compatible tested products. Using fire board alone does not make a wall fire rated.
Do fire rated walls need fire doors?
Yes. A door in a fire rated wall must be a fire door set tested to the same or appropriate rating, with compatible frame, hinges, closer, seals and signage. A standard door undermines the wall. We supply complete tested door sets and can check existing doors for suitability.
Tell us about your Southampton office and we will arrange a free survey and a fixed, written quote for your fire rated partition walls.
