- Postcode area
- BS
- County
- Somerset
- Region
- South West
- Population (approx.)
- 21,000
- From our Birmingham office
- 86 miles
- Typical lead time
- 1–3 weeks
What should Clevedon offices plan for?
Rural and edge-of-town premises near Clevedon can have awkward access, so we plan panel sizes and delivery times on the survey to avoid surprises on the day.
A small team in Clevedon usually wants the job done quickly and tidily; most compact installations are finished in one or two days once the glass or boards are ready.
How much do fire rated partition walls cost in Clevedon?
The required duration (30, 60 or 90 minutes), number of fire board layers, wall height and the extent of fire stopping around services and at the head set the price. Typical lead time: 1–3 weeks. Guide prices, supply and install — fixed after a free survey.
What do you get with us in Clevedon?
Built to the tested system
We follow the manufacturer's tested details for studs, boards, fixings and head, so the wall achieves the classification it is meant to have.
Work around your hours
Evening and weekend installation can be arranged for occupied Clevedon offices, keeping disruption to a minimum.
Handover records
You receive the system classification, fire-stopping record and photographs, giving your fire risk assessor and Building Control clear evidence of what was built.
Clear guide prices online
Our fire rated partition walls prices are published as guide ranges, so you can budget before the survey.
Typical fire rated partition walls projects we see in Clevedon include protected escape corridors, server, comms and plant rooms and kitchens and storage rooms. Services crossing the wall are coordinated in advance and sealed with tested products, which is where most fire walls actually fail in inspections.
Specification highlights
| Classification | EI 30, EI 60 or EI 90 integrity and insulation, to the tested system |
|---|---|
| Boarding | One to three layers of 12.5mm or 15mm fire-resistant plasterboard each side |
| Insulation | Mineral wool to the system specification |
How do surveys work in Clevedon?
We cover Clevedon along with nearby Avonmouth, Weston-super-Mare and Clifton. Surveys are free and usually take under an hour for a typical office floor.
In England, partition works that affect fire safety or means of escape fall under the Building Regulations, so we flag anything that may need Building Control at survey stage.
What happens next?
Book a survey
A member of the team measures the Clevedon office, notes access and services, and discusses layout, privacy and acoustics with you.
Drawings and quote
We prepare drawings and an itemised fixed price, adjusting the design until it works for your team and budget.
Manufacture and planning
Glass and components are made to the surveyed sizes while we plan access, deliveries and any out-of-hours working.
Install and sign-off
We fit the partitions with minimal disruption, complete snagging and walk you through the finished space.
Clevedon fire rated partition walls FAQs
Can you work out of hours at our Clevedon office?
Yes. Evening and weekend installation can be arranged in Clevedon so the office keeps running. Out-of-hours working usually adds a percentage to the labour cost, which is shown clearly on the quote.
Do you cover areas near Clevedon?
Yes. As well as Clevedon we regularly cover Avonmouth, Weston-super-Mare and Clifton, plus the rest of Somerset and South West. Survey and installation teams are arranged regionally.
How much does a fire rated partition wall cost?
Fire rated partition walls typically cost £75–£125 per m² supplied and installed, excluding VAT. A 30-minute wall with one layer of fire board each side sits at the lower end; 60 or 90-minute walls with multiple layers and extensive fire stopping sit at the top. Fire doors are priced separately. We confirm a fixed price after a free survey.
Do fire rated walls need fire doors?
Yes. A door in a fire rated wall must be a fire door set tested to the same or appropriate rating, with compatible frame, hinges, closer, seals and signage. A standard door undermines the wall. We supply complete tested door sets and can check existing doors for suitability.
Whether your Clevedon project is a single room or a whole floor, we will survey, design and install your fire rated partition walls with one team.
