- Postcode area
- B
- County
- Worcestershire
- Region
- West Midlands
- Population (approx.)
- 88,000
- From our Birmingham office
- 17 miles
- Typical lead time
- 1–3 weeks
What is different about partitioning in Redditch?
Smaller floorplates in Redditch make every metre count, so we often recommend glass that keeps daylight moving across the office while still giving managers a private room.
In Redditch, installations are often completed in a few days, and we can usually start on site soon after drawings are signed off because the survey answers the practical questions early.
How much do fire rated partition walls cost in Redditch?
The required duration (30, 60 or 90 minutes), number of fire board layers, wall height and the extent of fire stopping around services and at the head set the price. Typical lead time: 1–3 weeks. Guide prices, supply and install — fixed after a free survey.
What do you get with us in Redditch?
Covering all of Worcestershire
Survey and installation teams cover Redditch and the wider Worcestershire area, including Bromsgrove and Solihull.
Fixed price, in writing
Your quote lists the system, glass, doors, finishes and any extras, so the figure you approve is the figure you pay.
Handover records
You receive the system classification, fire-stopping record and photographs, giving your fire risk assessor and Building Control clear evidence of what was built.
Acoustic bonus
Multi-layer fire walls are also good acoustic walls, so plant rooms and stair enclosures keep noise away from the surrounding office.
Typical fire rated partition walls projects we see in Redditch include protected escape corridors, riser enclosures and tenancy separation walls. We follow the manufacturer's tested details for studs, boards, fixings and head, so the wall achieves the classification it is meant to have.
Key specifications
| Test standard | Non-loadbearing walls tested to BS EN 1364-1 (older data to BS 476-22) |
|---|---|
| Framing | Steel studs 50–146mm at the system's specified centres |
| Acoustic performance | Approx. Rw 45–55 dB depending on build-up (lab) |
Do you survey in Redditch?
We cover Redditch along with nearby Bromsgrove, Solihull and Halesowen. Surveys are free and usually take under an hour for a typical office floor.
In England, partition works that affect fire safety or means of escape fall under the Building Regulations, so we flag anything that may need Building Control at survey stage.
What happens next?
Book a survey
A member of the team measures the Redditch office, notes access and services, and discusses layout, privacy and acoustics with you.
Specification sign-off
Drawings, system choice, glass and door details are confirmed in writing alongside a fixed quote.
Production and logistics
Made-to-measure panels are produced and we book deliveries, lifts and parking around your building.
Fit, check and hand over
Installation is completed, doors and seals are adjusted, the area is cleaned and the job is signed off with you.
Redditch fire rated partition walls FAQs
How much do fire rated partition walls cost in Redditch?
Our guide price for fire rated partition walls is £75–£125 per m², supply and install, excluding VAT. The final price for a Redditch project depends on the measured size, doors, glass or board specification and access, and is fixed after the free survey.
How soon can you start on a Redditch project?
Typical lead time for fire rated partition walls is 1–3 weeks from signed-off drawings, mostly because materials are made to measure. Installation itself is usually a matter of days for a typical office, and we can phase work around a Redditch office that stays open.
How long does a fire rated stud wall last in a fire?
Office fire walls are commonly classified for 30, 60 or 90 minutes, such as EI 30 or EI 60. That figure is the time the tested wall maintained integrity and insulation in a standard furnace test. The duration you need is set by the building's fire strategy and Approved Document B.
Who signs off a fire rated partition wall?
Where walls affect escape routes or compartmentation, Building Control normally reviews and inspects the work. Your fire risk assessor will also want evidence for the fire risk assessment. We hand over the system classification, fire-stopping records and photographs so both can verify what was built.
Tell us about your Redditch office and we will arrange a free survey and a fixed, written quote for your fire rated partition walls.
