- Region
- South East
- Nation
- England
- Towns listed
- 6
- Main postcode areas
- BN, TN
- Typical lead time
- 1–3 weeks
What should East Sussex projects plan for?
Parking and loading in central Brighton can be restricted, so glass deliveries are booked into agreed slots and panels are sized to fit the lifts and stairwells we measured on survey.
Offices in Brighton range from first-floor suites above the high street to modern units on the edge of town, and the right partition system depends as much on the building as on the budget.
How much do fire rated partition walls cost in East Sussex?
The required duration (30, 60 or 90 minutes), number of fire board layers, wall height and the extent of fire stopping around services and at the head set the price. Typical lead time: 1–3 weeks. Guide prices, supply and install — fixed after a free survey.
Why choose us in East Sussex?
Built to the tested system
We follow the manufacturer's tested details for studs, boards, fixings and head, so the wall achieves the classification it is meant to have.
Snagging and aftercare
We return to adjust doors and closers after the building settles, and repairs or alterations are only a call away.
Penetrations planned
Services crossing the wall are coordinated in advance and sealed with tested products, which is where most fire walls actually fail in inspections.
Work around your hours
Evening and weekend installation can be arranged for occupied Brighton offices, keeping disruption to a minimum.
The most common failures are not the boards but the gaps. Cables, pipes and ducts passing through the wall, sockets and back boxes, deflection heads and junctions with the façade all need fire stopping that is compatible with the wall's rating. We plan penetrations with your M&E contractor, use tested fire-stopping products and record what was installed, with photos taken before the second side is closed. At handover you receive the system classification and the fire-stopping record, which your fire risk assessor and Building Control will want to see.
Key specifications
| Classification | EI 30, EI 60 or EI 90 integrity and insulation, to the tested system |
|---|---|
| Test standard | Non-loadbearing walls tested to BS EN 1364-1 (older data to BS 476-22) |
| Insulation | Mineral wool to the system specification |
| Acoustic performance | Approx. Rw 45–55 dB depending on build-up (lab) |
Surveys across East Sussex
We cover Brighton along with nearby Brighton, Hove and Eastbourne. Surveys are free and usually take under an hour for a typical office floor.
In England, partition works that affect fire safety or means of escape fall under the Building Regulations, so we flag anything that may need Building Control at survey stage.
How does a project run?
Free survey
We visit your Brighton premises, measure up, check ceilings, floors and services and talk through how the space needs to work.
Drawings and quote
We prepare drawings and an itemised fixed price, adjusting the design until it works for your team and budget.
Manufacture and planning
Glass and components are made to the surveyed sizes while we plan access, deliveries and any out-of-hours working.
Fit, check and hand over
Installation is completed, doors and seals are adjusted, the area is cleaned and the job is signed off with you.
Towns we cover for fire rated partition walls in East Sussex
- Fire Rated Partition Walls in Brighton
- Fire Rated Partition Walls in Hove
- Fire Rated Partition Walls in Eastbourne
- Fire Rated Partition Walls in Hastings
- Fire Rated Partition Walls in Lewes
- Fire Rated Partition Walls in Bexhill-on-Sea
Fire Rated Partition Walls in East Sussex: FAQs
Will our Brighton landlord need to approve the partitions?
If you lease your Brighton office, the lease will usually require landlord consent — often a licence for alterations — before partitions are installed. We supply drawings, specifications and method statements to support the application.
Do you cover areas near Brighton?
Yes. As well as Brighton we regularly cover Brighton, Hove and Eastbourne, plus the rest of East Sussex and South East. Survey and installation teams are arranged regionally.
How much does a fire rated partition wall cost?
Fire rated partition walls typically cost £75–£125 per m² supplied and installed, excluding VAT. A 30-minute wall with one layer of fire board each side sits at the lower end; 60 or 90-minute walls with multiple layers and extensive fire stopping sit at the top. Fire doors are priced separately. We confirm a fixed price after a free survey.
Do fire rated walls need fire doors?
Yes. A door in a fire rated wall must be a fire door set tested to the same or appropriate rating, with compatible frame, hinges, closer, seals and signage. A standard door undermines the wall. We supply complete tested door sets and can check existing doors for suitability.
Ready to plan fire rated partition walls in Brighton? Send a few details or call us and we will book a survey at a time that suits.
