- Postcode area
- BR
- County
- Greater London
- Region
- London
- From our Birmingham office
- 115 miles
- Typical lead time
- 1–3 weeks
What should Bromley offices plan for?
A lot of Bromley's office space sits in multi-let buildings where the landlord's fit-out rules set what can fix to ceilings and floors. We read those rules early so the design is approved first time.
Parking and loading in central Bromley can be restricted, so glass deliveries are booked into agreed slots and panels are sized to fit the lifts and stairwells we measured on survey.
Fire Rated Partition Walls prices in Bromley
The required duration (30, 60 or 90 minutes), number of fire board layers, wall height and the extent of fire stopping around services and at the head set the price. Typical lead time: 1–3 weeks. Guide prices, supply and install — fixed after a free survey.
Why use us for fire rated partition walls in Bromley?
Landlord-ready paperwork
Drawings, method statements and risk assessments are supplied for your landlord or managing agent's approval.
Snagging and aftercare
We return to adjust doors and closers after the building settles, and repairs or alterations are only a call away.
Built to the tested system
We follow the manufacturer's tested details for studs, boards, fixings and head, so the wall achieves the classification it is meant to have.
Handover records
You receive the system classification, fire-stopping record and photographs, giving your fire risk assessor and Building Control clear evidence of what was built.
Typical fire rated partition walls projects we see in Bromley include stair and lift enclosures, riser enclosures and kitchens and storage rooms. Services crossing the wall are coordinated in advance and sealed with tested products, which is where most fire walls actually fail in inspections.
What specification is typical?
| Classification | EI 30, EI 60 or EI 90 integrity and insulation, to the tested system |
|---|---|
| Boarding | One to three layers of 12.5mm or 15mm fire-resistant plasterboard each side |
| Acoustic performance | Approx. Rw 45–55 dB depending on build-up (lab) |
Do you survey in Bromley?
We cover Bromley along with nearby Croydon, Canary Wharf and Southwark. Surveys are free and usually take under an hour for a typical office floor.
In England, partition works that affect fire safety or means of escape fall under the Building Regulations, so we flag anything that may need Building Control at survey stage.
What happens next?
Book a survey
A member of the team measures the Bromley office, notes access and services, and discusses layout, privacy and acoustics with you.
Specification sign-off
Drawings, system choice, glass and door details are confirmed in writing alongside a fixed quote.
Production and logistics
Made-to-measure panels are produced and we book deliveries, lifts and parking around your building.
Fit, check and hand over
Installation is completed, doors and seals are adjusted, the area is cleaned and the job is signed off with you.
Questions about fire rated partition walls in Bromley
How soon can you start on a Bromley project?
Typical lead time for fire rated partition walls is 1–3 weeks from signed-off drawings, mostly because materials are made to measure. Installation itself is usually a matter of days for a typical office, and we can phase work around a Bromley office that stays open.
Do you cover areas near Bromley?
Yes. As well as Bromley we regularly cover Croydon, Canary Wharf and Southwark, plus the rest of Greater London and London. Survey and installation teams are arranged regionally.
How much does a fire rated partition wall cost?
Fire rated partition walls typically cost £75–£125 per m² supplied and installed, excluding VAT. A 30-minute wall with one layer of fire board each side sits at the lower end; 60 or 90-minute walls with multiple layers and extensive fire stopping sit at the top. Fire doors are priced separately. We confirm a fixed price after a free survey.
Who signs off a fire rated partition wall?
Where walls affect escape routes or compartmentation, Building Control normally reviews and inspects the work. Your fire risk assessor will also want evidence for the fire risk assessment. We hand over the system classification, fire-stopping records and photographs so both can verify what was built.
Ready to plan fire rated partition walls in Bromley? Send a few details or call us and we will book a survey at a time that suits.
